Please enter your search keyword...

Log in

Email:/Phone:
Password: Forget password
Don't have an account yet? Free registration

Register

Company*:
Department*:
Model*:
Robot*:
Contacts*:
Number*:
Email*:
Code*: Get code
Password*
Re-enter*:

Retrieve password

Email:
Email verification code Send verification code
New password:
Re-enter your new password:

After-sales service

STAR维修保养手册

1.Why should equipment be maintained?

Due to the work of the robot, it involves the work of mechanical motion and electronic parts. All mechanical movement, will inevitably produce friction, it is necessary to timely lubrication, friction generated waste, must be cleaned in time, long-term neglect of maintenance, will increase the wear and failure rate of the machine. The service life of electronic parts is closely related to the environment and temperature. In the dust pollution environment, if the dust of electronic parts is not cleaned up in time, in the long run, the heat dissipation of electronic parts will be poor. At the same time, when the water content of the air is large, the dust will become moist and conductive, which will greatly damage the electronic parts. Timely maintenance and maintenance of the machine is very important. We hope that your company can pay attention to timely maintenance in daily use.

2.General Maintenance Inspection Content

*Control Box Part

Classify

Check item

Check Method

Judgment Standard

JudgmentValue

Control Part

1

Confirmation of appearance

(box · operating box)

Visual  check

No scratchs, no pits, no dirt

2

Operating box lcd screen

Visual  check

No poor display of text and no flicker

3

Operation box button switch

Press the touch button

Picture response is smooth

 

4

Emergency stop switch

(box · operating box)

Press the emergency stop button

Action stop (turn off the power)

5

Electric leakage switch

Press the leakage test button

Leakage mode appears

(turn off the power)

6

Internal wiring of the box

Visual  check

Terminals and connectors are not loose, and the insulation layer of the power cable is not peeled

7

Cooling fan

Visual  check

Inhale or blow in the direction indicated

8

Confirmation of alarm history

Visual  check

1.not easy to occur alarm which will not have a high frequency.

2.if there are multiple alarms such as clamping errors, ask the customer and give advice

*Mechanical Part

Cassify

Check item

Check method

Judgment Standard

 Judgmentvalue

Mechanical Part

1

Traverse belt tension value

Measure

Measured value(             )

Reference value(             )

Adjusted value(            )

2

Product crosswise belt tension value

Measure

Measured value(             )

Reference value(             )

Adjusted value(            )

3

Product vertical belt1sttension value

Measure

Measured value(             )

Reference value(             )

Adjusted value(            )

4

Product vertical belt2nd tension value

Measure

Measured value(             )

Reference value(             )

Adjusted value(            )

5

Runner crosswise belt tension value

Measure

Measured value(             )

Reference value(             )

Adjusted value(            )

6

Runner vertical belt1sttension value

Measure

Measured value(             )

Reference value(             )

Adjusted value(            )

7

Runner vertical belt 2ndtension value

Measure

Measured value(             )

Reference value(             )
adjusted value(            )

8

Compressed air

Visual  check

No too much oil, water

Cassify

Check item

Check method

Judgment Standard

 JudgmentValue

Mechanical Part

1

Vertical/Crosswise/Traverse Confirmation of screw fixation

Whether the marker is offset By Visual check

The marker is not offset

2

LM guide rail / slide of the drive part of each axis

Visual  check

The guide rail has oil injection, no damage, scars, oil stains, etc

The LM slider has not damaged

3

Timing belt for the drive part of each axis

Visual  check

No damage, be out of shape, warp, etc

4

The action sound of the driving part of each axis

Hear

No noise as well as the sound of action which is not smooth

5

Wiring and piping of each  axis

Visual  check

No Fracture/Deformation/Surface Damage

6

Towing chain and communication wiring for each axle

Visual  check

No interference with other parts

7

Supply Pressure

Visual  check

Pressure meter (.5mpa)

(     )MPa

Left and right

8

Balance cylinders air pressure

 Visual  check

Up and down of main arm

(     )MPa

( machines without balanced cylinders can be ignored )

Standard (   )mpa

Adjusted (  )mpa

Up and down of accessory arms

(     )MPa

Standard (   )mpa

Adjusted (  )mpa

9

Vacuum generating unit suction confirmation (oil contamination of filter)

Visual  check

Vacuum pressure gauge’s pointer

(     )MPa

Clean

When the suction is closed, it is displayed below -50kpa

When sucked open, "0" is displayed.

10

Cylinder/Solenoid valve/Connector

Hear

No air leakage, etc

11

Buffer of all axis

Visual  check

No oil leakage

(non-buffer machines can be ignored  )

12

electronic component

Visual  check

No oil pollution, blockage, water, etc

( Relief valve )

13

Silencer

Visual  check

No oil pollution, blockage

14

Vibration and buffering state when each axis stops

Visual  check

The shaking and bumping will not affect the other parts

15

Between robot and supplementary base

Visual  check

The spring shim is not damaged or loose

The Confirmation of   installing screw

Check

Other

1

Display/warning nameplate

Visual  check

No peeling, oil, etc

2

Specification

 Check

3

3s work

Visual  check

 

3. Matters Need Attention In The Maintenance Process

Matters need attention

Picture

1

In the maintenance process, please be sure to cut off the power supply of the control box, turn off the air switch above the control box, and start the maintenance work ten minutes later.

2

During the whole maintenance process, when it comes to the dust cleaning of the electrical parts of the control box, remember one principle: you can not use compressed air with moisture in it to blow.This is the big taboo of electrical parts, if not careful, will damage electrical parts.

3

After cleaning the dust, please restore the protective cover of the machine. Do not work with the cover open, which is easy to cause the invasion of dust and water, and damage the machine.










4.Matters Need Attention Of Guide Rail Refueling 

Matters Need Attention

1

Must choose the grease specified by our company, (AFB-LF) oil nozzle of the oil gun is customized by our company, about grease oil gun, please order from our company.

2

Please refuel according to the guidance . Please refuel according to the fuel cycle of the model (29 days for small machine, 35 days for medium machine, 50 days for large machine). Recommended THK special grease: AFB-LF

3

For the normal use of the machine, please do not use it for a long time in the case of oil shortage, which will lead to the damage of LM guide rail and slider of the robot arm and abnormal sound.

4

When refueling, it should be noted that if the guide rail has abnormal sound before refueling, and it still does not improve after refueling, it means that the guide rail and slide have problems, please timely repair.

5

When refueling it is necessary to observe carefully according to the different size of the model. It is found that the other side of the slider has new butter overflow, which means that the refueling amount is enough. Please clean up the oil residue on the guide rail in time. It must be cleaned up in time. The contaminated oil will greatly damage the guide rail and slide because it contains the metal powder after friction and spoiled butter. So it must be cleaned up in time.

6

In the process of maintenance refueling, If you have any problem please do not hesitate to contact with our company's after-sales service department.

7

This refueling periodic form is calculated on the basis of 20 hours of production per day

 

0.079105s